Maurel & Prom : Nine-month activity and sales for 2015: €204.8 million

Paris, 5 November 2015
 No. 23-15

Nine-month activity and sales for 2015: €204.8 million

 
  


Activities hampered in the first nine months of 2015
-       drop in the price of oil: -52% to $50.9/bbl
-       sales down by 54% to €204.8 million
-       evacuation-related constraints from the Coucal/Cap Lopez pipeline:
-          production limited to 19,689 bopd for the first nine months of 2015
-          complete shutdown (operator claimed force majeure) in September 2015
-       connection to gas pipeline in Tanzania

A favourable outlook
-       gradual return to production after resolution of the situation of force majeure and end to reinforcement works by the pipeline operator in Gabon
-       recent EZNI and EZMA discoveries entering into production
-       record production on 22 October 2015 : 31,079 bopd
-       payment from first gas sales under the new gas sale agreement in Tanzania  

  Adjustment of financial covenants as at 31/12/2015

 
  


Sales for the first nine months of 2015      
                 
  Q1 2015 Q2 2015 Q3 2015    9 months 2015    9 months 2014 Chg.
15/14
                   
Total production sold over the period                        
barrels of oil 1,378,825 1,569,899 1,077,793    4,026,517    5,236,356 -23%
million BTU - Tanesco 95,438 102,420 102,890    300,748    266,450 13%
million BTU - TPDC/Gasco 0 0 471,526    471,526    0 100%
                   
Average sale price                        
OIL in $ per barrel 48.8 57.6 43.8    50.9    106.6 -52%
GAS in $ per million BTU - Tanesco 5.36 5.36 5.36    5.36    5.36 -
GAS, in $ per million BTU - TPDC/Gasco 3.00 3.00 3.00   3.00   n/a -
                 
EUR/USD exchange rate 0.89 0.91 0.90    0.90    0.74 22%
                       
SALES                       
Oil production 59.8 82.4 44.1   186.3    412.7   
Gabon 59.4 81.9 42.6    183.9    411.7 -55%
Tanzania 0.4 0.5 1.5    2.4    1.0 139%
Drilling operations 10.1 5.5 3.0   18.6    34.2 -46%
Consolidated sales 69.9 87.9 47.1   204.8   446.8 -54%
                  

The Group's consolidated sales for the first nine months of the year were down 54% to €204.8 million. Sales were affected by the drop in oil prices and production constraints since the beginning of the year:

  • total shutdown of production in September 2015 following notification by Association Coucal of a situation of force majeure regarding the evacuation pipeline;
     
  • temporary production shutdown (in January and June) to increase the capacities of surface installations: these shutdowns were initiated by Maurel & Prom in order to allow the connection of additional facilities (electricity generation, oil/water treatment, etc.) with the objective of increasing the oil production capacity of the producting fields;
     
  • technical restriction on the evacuation pipeline's capacity between January and September 2015. These problems did not reappear after production resumed normal levels; and
     
  • contraction in the average price per barrel of oil by nearly 52% over the first nine months of 2015 ($50.9/bbl compared with $106.6/bbl in the same period of 2014).
Production data in barrels of oil per day (bopd) for the first nine months of 2015 in Gabon
                 
bopd Q1 2015 Q2 2015 Q3 2015    9 months 2015    9 months 2014 Chg. 15/14
                 
Production at 100% 20,447 23,048 15,625    19,689    25,233 -22%
M&P share 16,358 18,439 12,500    15,751    20,186 -22%
Entitlements 15,320 17,252 11,715    14,749    18,887 -22%
                 

An average of 19,689 bopd were lifted during the first nine months of the year, in light of the limitations encountered. In October 2015, after works by the pipeline operator and following the resolution of the force majeure, field production gradually resumed.  With increased pressure in the reservoir observed following shutdown of production, water injection continued independently of the situation of force majeure, and the first oil of two discovery wells, EZNI-1 and EZMA-1, boosted production to its maximum of 31,079 bopd on 22 October 2015. Since that date, production has performed at an average of 27,869 bopd. On 4 November 2015, it was up to 29,129 bopd.

Maurel & Prom has opened production wells on the Mnazi Bay gas field in Tanzania since late August. Three wells have been connected, although production was limited to 30 MMscfd in line with TPDC demand. A production plateau of 80 MMscfd should be achieved by the end of the year, according to the gas demand from TPDC. Maurel & Prom sales in Tanzania stood at $2.4 million for the first nine months of 2015. Under the new gas sale agreement, a payment was made on 3 November 2015.

The improvement of the USD/EUR exchange rate (+22%) partially offset the combined effect of the fall in quantities sold and the drop in oil prices.

Drilling operations

This activity has been severely affected by the drastic reduction in oil operators' investment programmes with a direct and immediate influence on drilling programmes. The fleet utilisation rate was 44% in addition to the management of a rig for the Ezanga association, illustrating the contraction of activities in 2015. Sales for this activity amounted to $38.3 million, spread over the African continent between Gabon (64%), the Congo (18%) and Tanzania (18%). Caroil achieved 54% of its sales with customers outside the Group, amounting to a contribution of $20.7 million to Maurel & Prom's consolidated sales at 30 September 2015.

Exploration activities

The main part of the exploration programme in Colombia was postponed until 2016. Some exploration wells will not be drilled before the end of 2015.

At Sawn Lake in Alberta (Canada), the pilot test of the SAGD (steam-assisted gravity drainage) process continues, carried out on the first two horizontal wells in order to evaluate the technical and commercial feasibility of the project for the production of bitumen by steam injection. Average production was
325 bopd during the first half of 2015, rising to 380 bopd in the third quarter of 2015. In order to provide a better assessment of the technical potential of the deposit, the pilot test will continue until the end of 2015 before being shelved.

The first stage of the exploration programme on Anticosti Island in Quebec has been completed. This consisted of a campaign of 12 stratigraphic surveys conducted without any cost overrun and complying with health, safety and environmental protection policies. The objectives of this first phase of works were to delineate the extent of the hydrocarbon resources and to identify three locations for the horizontal drilling exploration scheduled for summer 2016. Overall, the results of seven surveys in 2015, combined with five surveys carried out in 2014, match expectations in terms of the thickness of the Macasty Formation, the total organic carbon (TOC) content, porosity, permeability and maturity. These results compare favourably with those from other basins in North America where oil and gas are produced from bedrock.

Amendment to financial covenants and the period of production level tests

The Maurel & Prom Group's bank debt comprises two separate loan agreements:

  • a revolving credit facility (RCF) for a total amount of $650 million, with $400 million drawn down and an accordion of $400 million, signed with a consortium of international banks; and
  • a $50 million loan agreement signed with a banking syndicate led by Crédit Suisse.

Under the terms of the two loan agreements, Maurel & Prom undertook to comply with the following financial and production covenants on 30 June and 31 December of each year:

For the RCF:

  • the ratio for the Group's consolidated net debt/EBITDAX[1], calculated over a period of 12 months preceding the reference period, must not exceed 3.00:1.00;
  • the ratio for the Group's share of P1+P2 reserves x US$10 cannot be lower than one and a half times the Group's consolidated net debt; and
  • with regards to fields included in the Ezanga production-sharing contract, the level of Maurel & Prom's production share must not be less than an average of 19,000 barrels per day over the second half of 2015, which must be checked for the first time on 31 December 2015.

For the loan agreement:

  • the ratio for the Group's net debt/EBITDAX, calculated over a period of 12 months preceding the reference period, must not exceed 3.00:1.00; and
  • the liquidity ratio (Group's current assets/current liabilities), calculated over a period of
    12 months preceding the reference period, must not exceed 1.10:1.00.

As at 30 June 2015, all financial covenants had been complied with (the verification of compliance with the RCF-related production covenant is only applicable at 31 December 2015 in respect of the second half of 2015).

The decline in oil prices, problems with evacuation and the situation of force majeure in Gabon in September 2015 led the Group to request the adjustment of certain periods of calculation of minimum production levels and certain financial ratios in order to avoid the risk of non-compliance with the undertakings at the end of 2015. These waivers and adjustments were accepted by the RCF banking consortium on 13 October 2015 and formally by the banking syndicate of the loan agreement on 27 October 2015.

Regarding the RCF, the covenants applicable to Maurel & Prom for 31 December 2015 arising from the adjustments are described below:

  • the ratio for the net debt/EBITDAX, calculated over a period of 12 months preceding the reference period, on 31 December 2015 must not exceed 5.50:1.00[2]; and
  • in respect of Maurel & Prom's production in Gabon, the production level calculated at
    31 December 2015 should not be below an average of 19,000 barrels per day (Maurel & Prom share) calculated in the last quarter of 2015 (instead of the second half of 2015).

Finally, it is specified that Maurel & Prom also obtained a deferral of the period for the calculation of a minimum production level liable to represent a case for the accelerated reimbursement of the RCF: the Maurel & Prom production level for the production of oil from fields included in the Ezanga production sharing contract, which must not fall below an average of 22,000 barrels per day, shall be calculated for the period from 1 December 2015 to 29 February 2016 instead of the last quarter of 2015.

With regard to the loan agreement, these adjustments were formally accepted by the banking syndicate on 27 October 2015 (bearing in mind that the banking syndicate had given Maurel & Prom its agreement in principle in writing on 15 October 2015), and on the same terms as for the RCF with regard to the Group's consolidated net debt/EBITDAX ratio.

During discussions with Crédit Suisse the following additional changes were agreed:

  • the partial early repayment of $16.667 million corresponding to a third of the amount borrowed;
  • an increase in the interest rate set in the loan agreement to Libor +7.5%; and
  • the ratio for the Group's net debt/EBITDAX, calculated over a period of 12 months preceding the reference period, must not exceed 2.25:1.00 on 31 December 2016.

Following the repayment of $16.667 million on 30 October 2015, the dates for the repayment of the Group's debt are as follows:

In €m   2016   2017   2018   2019   2020   2021
RCF*[3]   -   68   68   68   68   91
Loan agreement*   -   -   30   -   -    
ORNANE 2019   -   -   -   253   -   -
ORNANE 2021   -   -   -   -   -   115
TOTAL in €m     -    68   98   321   68   206
* EUR/USD = 1.10                        

The redefinition of financial ratios and the adjustment of production test periods highlight the support from the banks and their confidence in Maurel & Prom. This adjustment is entirely independent from the proposed merger with MPI; inasmuch as Maurel & Prom's current and projected production performance satisfies these criteria.

Boosted by its sales in Tanzania, the increase in production in Gabon, with a new record achieved on
22 October of over 31,000 bopd, as well as by a debt structure that does not present any immediate major maturity dates, the outlook for the Group is positive despite the context of low prices.

Governance

AGEFI, in bestowing its Grand Prizes for corporate governance, awarded Maurel & Prom third prize in the "Operation of Corporate Bodies" category.

Moreover, during the launch conference of the CDP 2015 report and the award ceremony of the "Climate Leadership Awards 2015" held November 4, 2015 at the Quai d'Orsay, Maurel & Prom has been awarded of "Best Newcomer France" for the quality of its response

 
  



       

Français
    Anglais
pieds cubes pc cf cubic feet
pieds cubes par jour pc/j cfpd cubic feet per day
milliers de pieds cubes kpc Mcf 1,000 cubic feet
millions de pieds cubes Mpc MMcf 1,000 Mcf = million cubic feet
milliards de pieds cubes Gpc Bcf billion cubic feet
baril b bbl barrel
barils d'huile par jour b/j bopd barrels of oil per day
milliers de barils kb Mbbl 1,000 barrels
millions de barils Mb MMbbl 1,000 Mbbl = million barrels
barils équivalent pétrole bep boe barrels of oil equivalent
barils équivalent pétrole par jour bep/j boepd barrels of oil equivalent per day
milliers de barils équivalent pétrole kbep Mboe 1,000 barrels of oil equivalent
millions de barils équivalent pétrole Mbep MMboe 1,000 Mbbl = million barrels of oil equivalent

For more information, go to www.maureletprom.fr
MAUREL & PROM
Tel: 01.53.83.16 00                                                                            

Press contacts, shareholder and investor relations
Tel: 01.53.83.16 45                                                                            
ir@maureletprom.fr

                                                                                                         


This document may contain forward-looking statements regarding the financial position, results, business and industrial strategy of Maurel & Prom. By nature, forward-looking statements contain risks and uncertainties to the extent that they are based on events or circumstances that may or may not happen in the future. These projections are based on assumptions we believe to be reasonable, but which may prove to be incorrect and which depend on a number of risk factors, such as fluctuations in crude oil prices, changes in exchange rates, uncertainties related to the valuation of our oil reserves, actual rates of oil production and the related costs, operational problems, political stability, legislative or regulatory reforms, or even wars, terrorism and sabotage.

 
  


Maurel & Prom is listed for trading on Euronext Paris - Compartment A
CAC® mid 60 - SBF120® - CAC® Mid & Small - CAC® All-Tradable - CAC® All-Share - CAC PME - EnterNext© PEA-PME 150
ISIN FR0000051070 / Bloomberg MAU.FP / Reuters MAUP.PA



[1] EBITDAX is equal to profit before interest, tax, exploration expense, amortisation and depreciation and before the impact of exchange gains and losses.

[2] 4.20 : 1.00 if the merger with MPI takes place

[3] On the basis of the $400 million already drawn




This announcement is distributed by Nasdaq OMX Corporate Solutions on behalf of NASDAQ OMX Corporate Solutions clients.
The issuer of this announcement warrants that they are solely responsible for the content, accuracy and originality of the information contained therein.
Source: Maurel & Prom via Globenewswire

HUG#1964738

Nachrichten zu Etablissements Maurel & PromAct.mehr Nachrichten

Keine Nachrichten verfügbar.

Analysen zu Etablissements Maurel & PromAct.mehr Analysen

Eintrag hinzufügen
Hinweis: Sie möchten dieses Wertpapier günstig handeln? Sparen Sie sich unnötige Gebühren! Bei finanzen.net Brokerage handeln Sie Ihre Wertpapiere für nur 5 Euro Orderprovision* pro Trade? Hier informieren!
Es ist ein Fehler aufgetreten!

Aktien in diesem Artikel

Etablissements Maurel & PromAct. 4,86 -2,33% Etablissements Maurel & PromAct.